Idempotency in Cron Jobs: How to Preserve Results When a Job Runs Twice
A design for identifying scheduled runs as the same business task and controlling duplicates and conflicts. Schedules can be duplicated, delayed, or fail. Treating the number of runs as equal to the number of successful saves can cause duplicate records and cost errors.

